CONDUCTING A SAP FINANCIAL PRODUCTS SUBLEDGER (FPSL) PRE-STUDY
Together with ARZ, ADWEKO has prepared a preliminary study for the introduction of FPSL as a replacement for the heterogeneous accounting landscape.

PROJECT PROCEDURE
- Development of a cross-architectural function location for accounting and transformation into a target image
- Elaboration of customer-specific structure-forming elements and consideration within the framework of various workshops
- Division of the overall project into several building blocks and derivation of a transformation roadmap
- Estimation of the costs of the individual building blocks and condensation to a cost calculation
- Summary of the individual preliminary study findings and results in an overall document
RESULTS AT A GLANCE
- Development of a target financial architecture based on SAP FPSL and SAP FSDP
- Development of a transformation roadmap
- Calculation of the project costs incurred
- Preparation of the overall results documentation